A retirement, handled in the right order

When the radar flags one of your models, the calendar has already done the first job: the shutdown date is in the feed your team watches, with 30, 7, and 1-day reminders, so the work starts with weeks in hand instead of hours. Open the dependency graph next. It lists every prompt that runs on the retiring model — usually more than the team remembers, because model IDs spread through fallbacks, eval harnesses, and that one internal tool nobody documented.

Then run the migration eval before touching production. Pick the replacement the provider names, run your saved prompts through it, and read the diffs by verdict: pass means the outputs hold, attention means a human should read the differences, fail means the replacement changes behaviour your product depends on. Cut over per prompt, not per product, starting with the passes.

One discipline runs through all of it: verify the date against the provider's official docs before you migrate. Radar statuses are curated starting points with review dates — good enough to start the work, never a substitute for the source. The shutdown calendar and the about page round out the picture.

Frequently asked questions

How does the radar alert me?

You register the models your product depends on; the radar watches provider deprecation signals and alerts you when one of yours is announced for retirement, with the shutdown date on record.

What does the dependency graph show?

Which of your prompts depend on each model. When a retirement is announced, you see your blast radius at a glance — every prompt that has to move, not just the first one you remember.

How does the shutdown calendar reach my team?

Every shutdown date is published as an ICS calendar feed with 30, 7, and 1-day reminders, plus an RSS feed of deprecation signals — so a retirement lands in the calendar your team already watches.

Sources

← Back