How Do You Use a Model Deprecation Calendar?
Published: November 14, 2026 · Reviewed: November 14, 2026 · 6 min read
By the Ingenious AI team
The short answer
Use a deprecation calendar as a planning instrument in four motions: filter it to the models in your registry (the full provider firehose is noise), compute each migration's start-by date backwards from its shutdown date, let the calendar drive milestone reminders at 30, 7, and 1 day, and review it where work is planned — the portfolio review and sprint planning, not a dashboard nobody opens. ModelMinder's public retirement calendar tracks announced shutdown dates for OpenAI, Anthropic, Google, and xAI models with vendor sources and last-verified dates, and offers iCal subscription so the dates live inside the calendar your team already runs its life on.
Filter first: your dates, not all dates
Providers retire models constantly; almost none of them are yours. An unfiltered calendar trains its audience to ignore it within a month — alert fatigue is a design outcome, not a character flaw. The calendar that works is a view over your registry: only models you depend on, each entry carrying its risk band and owner beside its date. ModelMinder's public calendar serves the discovery purpose (what has been announced across the major providers, sourced and verified), and the registry join is what turns it into your calendar. Keep both layers distinct in your tooling and your talk: the firehose for research, the filtered view for planning.
Compute start-by dates, not just shutdown dates
A shutdown date is the provider's deadline; your operative date is when work must start for the migration to finish with buffer — computed backwards through the phases (evaluation, recalibration, canary, cutover) at your team's demonstrated pace. Enter both dates on the calendar. The shutdown date belongs to the risk system; the start-by date belongs to the planning system, and it is the one whose passing should page someone. Estates that calendar only shutdown dates discover their planning failure at the start-by moment, unmarked, mid-quarter, with the window already spent. The arithmetic is simple and unforgiving, which is the point of writing it down.
Let milestones do the remembering
Human memory is the worst reminder system ever deployed. Milestone reminders at fixed offsets — ModelMinder computes recheck milestones at 30, 7, and 1 day before a shutdown for tracked models — convert the calendar from a reference into an actor: at 30 days, verification of the migration's state; at 7, confirmation that traffic is near zero; at 1, the final watch. Add your own earlier milestones at the window's thirds for migrations in flight. Each milestone should arrive attached to the state it expects to find ('at this reminder, the canary should be at 50 percent'), so opening it is a check, not a puzzle.
Put the calendar where planning happens
Subscribe the team calendar (iCal exists for this), open the portfolio review with the next two quarters of dates, and let sprint planning see migrations as dated work competing fairly with features — because they are. A calendar quarantined in a specialist tool is consulted by the specialist, alone, after the planning meetings where its information would have changed decisions. The integration test is simple: when a shutdown date moves, how many planning surfaces update without a human re-typing anything? Every manual copy is a future stale date with a meeting built on it.
Verify the calendar itself
Calendars inherit their sources' errors and edits. Each entry needs its source link and last-verified date — ModelMinder's calendar shows both per entry — and the verification cadence from the checking discipline applies to the calendar's contents: dates diffed against provider pages, changes routed to owners. A calendar entry whose verification is older than its cadence is a rumour with formatting. Treat the calendar's own freshness as a reported metric in the portfolio review, exactly like registry staleness: the instrument's reliability is part of the instrument.
Five actions to make a calendar drive work
- Build your working calendar as a filtered view over the registry — your models, their owners, their risk bands.
- Enter a computed start-by date beside every shutdown date, and alert on the start-by date's passing.
- Set milestone reminders at the window's thirds for active migrations and at 30, 7, and 1 day before shutdown for all dated models.
- Subscribe the calendar into the team's real planning surfaces — team calendar, portfolio review, sprint planning.
- Carry source and last-verified date on every entry, and report calendar staleness alongside registry staleness.
Worked example: Frostbyte Gaming's two-date system
Frostbyte Gaming, a fictional indie game studio, kept only shutdown dates until a live-service event collided with a migration's final week. It rebuilt its calendar practice around two dates per model: shutdown, and a start-by computed from its measured migration pace (roughly one week of phase work per endpoint cluster, plus buffer).
The next retirement was announced with a five-month window; its start-by date sat eleven weeks out, entered the roadmap as ordinary dated work, and the migration — 6 endpoints across the game's NPC-dialogue and moderation features — executed inside normal sprints, finishing five weeks early. Dialogue cost per session fell from $0.021 to $0.017, p95 response latency from 2.9s to 2.4s, and no live event was harmed. The studio's producer now introduces the start-by column to other studios as 'the date that does the worrying for us'.
Frequently asked questions
Is a public calendar enough, or do we need our own?
Both layers do different jobs. The public calendar (ModelMinder's tracks the major providers with sources and verification dates) is the discovery and research layer. Your working calendar is the registry-filtered view with owners, start-by dates, and milestones. Skipping the second layer leaves you informed and unplanned.
How should start-by dates be computed?
Backwards from shutdown: sum your phases at your demonstrated pace (evaluation weeks, recalibration, canary duration at your traffic, cutover), then place the remainder as buffer — targeting cutover completion with at least a quarter of the window left. Use your last migration's actual phase durations, not estimates, once you have them.
What calendar format works best?
The one your planning already uses — which usually argues for iCal subscription into the team calendar plus the registry view for detail. Format loyalty matters less than the two properties: filtered to your models, and present where decisions are made.
How do we handle a date that appears with no announcement we saw?
As a detection finding: verify it against the provider source, record it with its verification date, compute the start-by date (which may already be close), and review why the announcement channel missed it — the calendar worked, the radar needs the repair.
Should tentative or rumoured dates go on the calendar?
No — the calendar holds announced dates with sources. Rumours and forecasts belong in the portfolio review's discussion, flagged as unverified. A calendar that mixes the two destroys the property that makes it useful: every date on it is actionable fact.